Conference full papers - Open Access.

Idioma principal

BIM Maturity Index: Analysis and Comparison of Architecture Office’s BIM Performance in Porto Alegre

BIM Maturity Index: Analysis and Comparison of Architecture Office’s BIM Performance in Porto Alegre

Stumpp, Monika Maria ; Alves, Rodrigo Vitória ; Manica, Carlo Rossano ;

Conference full papers:

This study evaluated the BIM Maturity Levels of architecture offices in Porto Alegre (Brazil) by adapting the method developed by Succar (2009). It was carried out by applying a questionary in face-to-face interviews and converting the qualitative data obtained into quantitative, ultimately generating the BIM Maturity Index: a percentage number that can be classified and compared. The preliminary results indicate a significant discrepancy in BIM competences between the case studies while reasserting challenges faced by them in a regional scope: the scarcity of external stakeholders appropriately inserted on the BIM process and the undersupplied BIM knowledge offered in academic courses.

Conference full papers:

Palavras-chave: BIM, BIM Maturity, Project Managing, Case studies, Architecture offices,

Palavras-chave:

DOI: 10.5151/sigradi2020-70

Referências bibliográficas
  • [1] BRASIL (2018). Decreto n. 9.377, de 17 de maio de 2018. Institui a Estratégia de Disseminação do Building Information Modelling. Diário Oficial da União, Brasília, Edição 95, Seção 1, p. 3. Atos do Poder Executivo.Brasil.
  • [2] Barison, E.M. & Santos, E.T. (2013). Atual cenário da implementação de BIM no mercado da construção civil da cidade de São Paulo e demanda por especialistas. In SCHEER, S. et all. Modelagem da informação da construção: uma experiência brasileira em BIM. Curitiba: Capes.554p.
  • [3] Catelani, W. (2019). Como avançar na maturidade BIM no Brasil? Artigo do especialista. Disponivel em https://cbic.org.br/artigo- do-especialista-como-avancar-na-maturidade-bim-no-brasil/
  • [4] Cornetet, B. & W. Florio, W. (2015). Reflexão sobre a implantação do BIM em três escritórios de arquitetura em Porto Alegre, de 2010 a 2015. Encontro Brasileiro de Tecnologia de Informação e Comunicação na Construção, Recife.
  • [5] Garbini, M. A. L. & Brandão, D. Q. (2013). Implantação da tecnologia BIM analisada em quatro escritórios de arquitetura. Cadernos Proarq (2013), v. 21, pp. 125-146
  • [6] Garrido, C. M. et all. (2015). Using BIM for Last Planner System: Case Studies in Brazil. International Workshop on Computing in Civil Engineering. pp. 604-611.
  • [7] Manzione, L. (2013). Proposição de uma estrutura conceitual para a gestão do processo de projeto colaborativo com o uso do BIM. Tese de Doutorado - Escola Politécnica. São Paulo, 353 p.
  • [8] MacLeamy, P. (2010). The Future of the Building Industry (3/5): The Effort Curv. Disponivel em https://www.youtube.com/watch?v=9bUlBYc_Gl4
  • [9] Nardelli, E.S. (2018). BIM and Public Bidding in Brazil. Proceedings of the 22th Conference of the Iberoamerican Society of Digital Graphics, pp. 1212-1219, São Paulo.
  • [10] Nardelli, E. S. & Tonso L. G. (2014). BIM – Barreiras institucionais para a sua implantação no Brasil. Proceedings of the 18th Conference of the Iberoamerican Society of Digital Graphics (2014), pp. 408-411, Uruguay - Montevideo. Disponível em http://papers.cumincad.org/cgi- bin/works/Show?sigradi2014_292.
  • [11] Oliveira, L. & Pereira, A. (2011). Mudanças metodológicas decorrentes da implantação recente de BIM em escritórios de arquitetura", in Proceedings of the 15th Conference of the Iberoamerican Society of Digital Graphics, Santa Fé, Argentina.
  • [12] Rodrigues, A. (2018). Grau de Maturidade BIM: Estudos de Caso em empresas projetistas de Arquitetura na cidade de São Paulo”, Monografia (Especialização em Gestão de Projetos na Construção) - Escola Politécnica da Universidade de São Paulo. São Paulo, 164 pp.
  • [13] Ruschel, R.C. et all (2013). O ensino de BIM no Brasil: onde estamos? Ambiente Construído 13 (2), 151-165.
  • [14] Souza, L.L.A. de, Amorim, S.R.L. & Lyrio, A. de M. (2009). Impactos do uso do Bim em escritórios de arquitetura: oportunidades no mercado Imobiliário. Gestão & Tecnologia de Projetos, 4 (2), p.26-53.
  • [15] Succar, B. (2009). Building Information Modelling Maturity Matrix. Research on Building Information Modelling and Construction Informatics: Concepts and Technologies Australia, p.65-103. Austrália: IGI Publishing, nov. 2010.
  • [16] Succar, B. W. & Williams, S. A. (2012). Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, Volume 8, pp. 120-142. School of Architecture and Built Environment, University of Newcastle, Australia.
Como citar:

Stumpp, Monika Maria; Alves, Rodrigo Vitória; Manica, Carlo Rossano; "BIM Maturity Index: Analysis and Comparison of Architecture Office’s BIM Performance in Porto Alegre", p. 508-515 . In: Congreso SIGraDi 2020. São Paulo: Blucher, 2020.
ISSN 2318-6968, DOI 10.5151/sigradi2020-70

últimos 30 dias | último ano | desde a publicação


downloads


visualizações


indexações